/ News / Versatile Introduces Control Center: A First-of-Its-Kind Dashboard for Steel Erection Project Teams

Versatile Introduces Control Center: A First-of-Its-Kind Dashboard for Steel Erection Project Teams

Parul Dubey on July 10, 2025 - in News, Products

[Boca Rotan, FL] — July 10, 2025 — Versatile, a leader in AI-powered construction technology, today announced the launch of Control Center [www.versatile.ai/learn/control-center-introduction], the first project dashboard designed specifically for steel erection professionals. Control Center brings together production, schedule, and budget data into a single platform that project managers and operations leaders can use to drive performance across every jobsite.

Versatile developed Control Center to solve a problem many steel teams face daily. Project managers juggle spreadsheets, phone calls, text messages, and field reports just to understand whether a job is on track. Control Center eliminates the guesswork by delivering a consistent, clear view of jobsite health each day.

“Versatile believes that jobsite data is the most underutilized asset in construction. Control Center turns that data into a strategic advantage,” explains Versatile’s CEO, Eishay Smith. “It’s built for leaders who want clarity and visibility into their projects and care about performance.”

 

 

A Platform Built for the Realities of Steel Work

Steel teams face unique challenges. Dynamic jobsites means that schedules shift quickly and field crews often operate without digital tools necessary for today’s builds. Control Center addresses these realities by automatically capturing lift data through Versatile’s crane-mounted device and combining it with plan data and field inputs. The result is a dependable daily summary of jobsite activity that does not require extra work from the field and no new workflows for the team.

Key features include:

  • Jobsite Progress Dashboard: See delivery, installation, and turnover milestones without field check-ins
    Pace and Crane Activity Tracking: Monitor erection speed and crane utilization to identify slowdowns early
  • Automated Reporting: Generate daily summaries and shareable reports without manual data entry
  • Resource and Risk Visibility: Track performance against plan and make timely adjustments

Developed With Steel Experts in the Field

Versatile worked directly with project managers, superintendents, and operations leaders to design Control Center around their existing workflows. The goal was to provide value from day one, without adding reporting burdens or changing how teams operate.

Availability and What’s Ahead

Control Center is now available to all customers using Versatile. Additional capabilities, including material tracking, plan uploads, and AI-driven forecasting tools, will become available later this year.

“Our customers told us they needed clarity, not complexity,” emphasized Niko Suvorov, Versatile’s VP of Sales. “Control Center delivers just that, and we’re excited about what’s coming next.”

About Versatile

Versatile gives steel erectors and construction professionals visibility of jobsite performance by automatically turning crane activity into real-time, actionable data. Mounted to the crane hook, our AI-powered device captures every lift and movement without disrupting workflow, transforming raw activity into clear production metrics. Versatile delivers the right data to the right people at the right time, helping projects stay on pace, avoid delays, and protect profit. With no extra effort from the field, construction becomes more predictable, productive, and safe.

Want to learn more? Visit: www.versatile.ai, follow us on LinkedIn, or email us at vmarketing@versatile.ai

 

 

Comments are disabled